Construction of a social childcare center with HQE & BBC certifications, in Levallois (92).
Client: Ville de Levallois (Public)
Mission: Complete project management with OPC in collaboration with BET ALTECIA (Occupied environment)
Timeline: 2011
Construction Cost: €l,350,000 excluding taxes (GFA 850 m2) Special features: Energy performance CEP<50Kw enp/year, low-energy consumption BBC building, IDEX networks, thermal solar panels, double flow central system, efficient lighting